Blasting operation scheduled on SR 10 Loop & US 78 in Clarke county

press release from the georgia department of transportation

Georgia Department of Transportation is reporting that blasting is scheduled to take place between 10 a.m. and 2 p.m.on Wednesday, Sept. 25 on US78/SR 10 Atlanta Highway at SR 10 Loop Interchange in Clarke County. This operation is being done to remove rock from a hill next to the northbound ramp at SR 10 Loop Interchange. The northbound ramp will remain open until the countdown begins right before blasting. At this time, the northbound ramp will close and traffic control will be paced with law enforcement until it is cleared for motorists to proceed safely. Shortly after the blast occurs, the northbound ramp will re-open. Motorists should use caution while driving through the area. 

Advisory: Exact dates may change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions by calling 511, visiting 511ga.org, or downloading the Georgia 511 app.

Georgia Department of Transportation plans, constructs and maintains Georgia’s state and federal highways. We’re involved in bridge, waterway, public transit, rail, general aviation, bike and pedestrian programs. And we help local governments maintain their roads. Georgia DOT and its nearly 4,000 employees are committed to delivering a transportation system focused on innovation, safety, sustainability and mobility. The Department’s vision is to boost Georgia’s competitiveness through leadership in transportation.

Be the first to comment

Leave a Reply